Jump to content

Recommended Posts

  • ...JD TUNING ADELAIDE...
  • Legacy Donating Member
  • Member For: 18y 2m 8d
  • Gender: Male
  • Location: Adelaide
Posted

Twinsies bro 

  • Haha 1
  • Legacy Donating Member
  • Member For: 11y 6m 10d
  • Gender: Not Telling
Posted

From the TI performance website;

 

Fuel Outlet Diameter: 11mm OD (10.8 – 9.1mm)

  • Legacy Donating Member
  • Member For: 8y 2m 30d
Posted

so that would be an8/10mm line... so I guess you would twin entry an8's and an10 return? but it would depend on your FPR.

 

do you have both pumps full time? cause that's alot of fuel...or did you work out the boost referenced seciond pump/checkvalve/way of setup?

  • Legacy Donating Member
  • Member For: 11y 6m 10d
  • Gender: Not Telling
Posted

Yeah twin dash 8 feed and dash 8 into barb it of the reg into stock tank return. If the return is a restriction I'll upgrade that then.

 

They are both on at same time at the moment.

 

Now that they are on dedicated separate circuits I can trigger one through the pcm to come on as needed. I'll get onto it one day.

  • Member
  • Member For: 12y 10m 9d
Posted

Twin -8 is over the top. Single -8 split to -6 and then -8 return.

For info speedflow weld on an fittings match falcon fuel rail diameter perfectly. Be sure to remove all solder and zinc if your gonna tig it as any little bit will f@ck it from experience.

  • Thanks 1
  • Member
  • Member For: 14y 11m 6d
Posted
18 hours ago, JETURBO said:

That’s how I set up my twin feed rails ;)

 

Interesting stuff if you can make it work Nathan

Do you have a pic?

  • Legacy Donating Member
  • Member For: 11y 6m 10d
  • Gender: Not Telling
Posted

Well I've been thinking about car stuff as ya do and here's a thought...

 

With the fuel rail, what if I leave the feed stock and just remove the stock return assy from the rail and chuck a -8 there to fit a fpr2000 to the end of the rail??? As is, it is currently bypassing nearly 17 litres a minute at idle with the stock setup, albiet with a plugin fpr800. Haha I checked it on Sunday :declare:

 

My thinking is that there is no shortage of fuel, so a single reg that can bypass enough fuel should do the trick. I also think that I'll likely have to get a reg of that size anyway, so apart from a bit of time it wont involve any wasted money if it doesn't work out.

 

I've got several rails here so it's not a big deal to do some r&d. I'm still interested in others opinions though :)

  • Like 1
  • Legacy Donating Member
  • Member For: 11y 6m 10d
  • Gender: Not Telling
Posted

Yeah nah I changed my mind. There doesn't seem to be enough room for a reg at the end of the rail. I'm thinking... leave the stock feed, cut and shut the quick disconnect from another stock feed to the opposite end of the rail to make it twin feed and then do a dash 8 fitting in the top middle of the rail and then return it however to the stock return line.

 

Anyhow that's what I reckon, unless I think of something better.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...