.Stripes. All stock bar the k&n panel filter Legacy Donating Member 8,061 Member For: 14y 4m 5d Gender: Male Location: Perth Posted 21/02/16 07:49 AM Posted 21/02/16 07:49 AM ^that was what I noticed hahahaha.
Wilko16 Legacy Donating Member 1,672 Member For: 18y 7m 27d Gender: Male Location: Melbourne Posted 21/02/16 09:24 AM Posted 21/02/16 09:24 AM My little patch of dirt has a water tap and meter installed! Finally going to start the build Hopefully this week slab preparation begins [emoji16] Hopefully my house misses out on the head stabber 3000 haha 5
discostig Manual mode ________________________ All day, erryday Legacy Donating Member 13,798 Member For: 18y 7m 24d Gender: Male Location: Probably above atmospheric pressure Posted 21/02/16 11:10 AM Posted 21/02/16 11:10 AM Internal wall concreting is almost done at ours, proper window is in too, and all brickwork completed around windows. Blokes on site lit a fire after we left today...it's a fire ban and there's loads of leaves around there near the house FFS. Bit windy...if it got going.... Neighbour called us and I offered to go down and chat to them but they did it on our behalf. Workers are staying the night because they live like 4 hours away.
discostig Manual mode ________________________ All day, erryday Legacy Donating Member 13,798 Member For: 18y 7m 24d Gender: Male Location: Probably above atmospheric pressure Posted 29/02/16 02:55 PM Posted 29/02/16 02:55 PM Looking seriously like an actual house now! That's not the render on the front btw, pretty sure it's the same hard concrete like inside. Walking in to white rooms makes it feel so much more realistic. Here's the missus imagining all the tasty food she can cook me once the kitchen is done!! :D Pic taken in dining area (plastic bottle in above pic) at 11am, not too much sun getting in which is good. Planning on planting some plants down the bottom I think, to stop a bit more sun from heating us in summer. 5
bloodycrashboy Feeling the Love :-) Legacy Donating Member 4,421 Member For: 13y 3m 17d Gender: Male Location: Not in Cairns anymore Posted 29/02/16 07:28 PM Posted 29/02/16 07:28 PM Looking great Stever
Franga Legacy Donating Member 256 Member For: 11y 8m 27d Gender: Male Location: Melbourne, VIC Posted 29/02/16 09:07 PM Posted 29/02/16 09:07 PM Nice Steve, and here I am waiting for my land to settle which is now officially 3 months delayed. The goal of spending Christmas in the new home is seeming slimmer by each day. Oh well.
Pixy Angel Expert Legacy Donating Member 9,132 Member For: 21y 4m 21d Gender: Male Location: North Jamberoo, NSW Posted 29/02/16 10:21 PM Author Posted 29/02/16 10:21 PM Nice! It gives you more of an idea how big the rooms are when the walls are up. In pic 1 is that storm water pipes coming from the eaves Not seen here done that way in NSW.
discostig Manual mode ________________________ All day, erryday Legacy Donating Member 13,798 Member For: 18y 7m 24d Gender: Male Location: Probably above atmospheric pressure Posted 29/02/16 11:46 PM Posted 29/02/16 11:46 PM (edited) Yeah that down pipe is not going to stay there believe me. Another tiny thing we missed on the plans. Wasn't in the 3D perspective render either. We're going to set up something around the right hand corner to let it out instead of a pipe straight down the front of the portico. Who the hell would think that's a nice place. Spotted a nearby house that doesn't have one at all so might go ask them what they did to drain water from those gutters. It's a small section of roof at least. Edit Oh you mean the pipe on the brick face. It's not cut through yet so I'm interested to see what happens there. Edited 29/02/16 11:49 PM by -Stever-
Franga Legacy Donating Member 256 Member For: 11y 8m 27d Gender: Male Location: Melbourne, VIC Posted 01/03/16 09:00 PM Posted 01/03/16 09:00 PM Soil test complete. Looks good so fingers crossed we get to start building within 6 weeks. 2
Pixy Angel Expert Legacy Donating Member 9,132 Member For: 21y 4m 21d Gender: Male Location: North Jamberoo, NSW Posted 02/03/16 08:58 PM Author Posted 02/03/16 08:58 PM Well after 4 long months all the concrete slab are done. YA!! First up the concrete pump truck can park inside the garage. Back slab hold 3 beds rooms and bathroom and toilet Alfresco area and kitchen, lounge and dinning on that Media room, front entry and pouch 3
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now